At its February 24, 2025 meeting, the Region C Regional Water Planning Group approved its 2026 Initially Prepared Region C Water Plan. Region C also authorized its administrative agent and technical consultant to submit the IPP by March 3, 2025. The IPP was submitted to the Texas Water Development Board on March 3, 2025.
Quick Links to the 2026 Initially Prepared Region C Water Plan:
- 2026 Initially Prepared Plan (Volume I: Main Report)
- 2026 Initially Prepared Plan (Volume II: Appendices)
- 2026 Model Irrigation Water Conservation Plan
- 2026 Model Manufacturing Water Conservation Plan
- 2026 Model Municipal Water Conservation Plan
- 2026 Model Steam Electric Power Water Conservation Plan